Pre-planning Consultation

Pre-planning Consultation – Land to the South of Parc Maen Hir, Letterston.

Residential development is proposed on Land South of Parc Maen Hir, Station Road, Letterston. The proposal is for 26 affordable homes comprising a mix of houses, bungalows and apartments.  The site would be accessed from the existing Parc Maen Hir development off Station Road.

On 1st August 2016, the Welsh Government introduced a statutory requirement for all applicants to undertake Pre-Application Consultation with the public on all major planning applications in Wales.  ateb Group Ltd. is therefore making the contents of the Draft Planning Application available electronically via this webpage for public consultation. A copy of the formal Site Notice can be found here.

ateb Group Ltd. has instructed a team of consultants to prepare the scheme and undertaken detailed technical surveys and assessments to support the planning application. The team includes:

  • Barton Willmore (Planning Consultants)
  • Lewis Partnership (Architects)
  • Roger Casey Associates (Civil & Structural Engineers)
  • Acstro (Transport)
  • Dyfed Archaeological Trust (Archaeology)
  • Integral Geotechnique (Site Investigation)
  • Pembrokeshire Ecology (Ecology)
  • Catherine Etchell Associates (Landscape Architecture)
  • Tree Consultants Wales (Trees)

Pre-Application Consultation Documentation

Application Form

Design and Access Statement – September 2018

Existing Site & Location Plan – Drawing No. 01, Rev. A

Proposed Site & Location Plans – Drawing No. 02, Rev. B

Proposed Site Layout – Drawing No. 03, Rev. H

Existing Site Layout  – Drawing No. 04

Proposed 4 Person 2 Bed House  – Drawing No. 05, Rev. A

Proposed 4 Person 3 Bed House    – Drawing No. 06, Rev. A

Proposed 3 Person 2 Bed Bungalow    – Drawing No. 07, Rev. A

Proposed 3 Person 2 Bed Elderly Bungalow   – Drawing No. 08, Rev. A

Proposed 2 Person 1 Bed Flat  – Drawing No. 09, Rev. B

Proposed 2 Person 1 Bed Bungalow     – Drawing No. 10, Rev. A

Existing Site Sections   – Drawing No. 11

Proposed Site Sections   –  Drawing No. 12, Rev. A

Planting Plan   – Drawing No. 440.01

Tree Protection Plan  – Drawing No. 1

Extended Phase 1 Habitat Survey   – 11th July 2019

Historic Environment Appraisal Update     – July 2019

Transport Statement   – July 2019

Site Investigation Report  – February 2008

Drainage Strategy Report  – May 2019

Engineering Site Plan (Drainage)  – Drawing No. 20057/04

Street Lighting Site Plan   – Drawing No. 20057/05, Rev. A

 

Pre-planning Consultation:

GET IN TOUCH

If you wish to make a comment on the proposed development, then please write to:

Land South of Parc Maen Hir Consultation

c/o Barton Willmore

Greyfriars House

Greyfriars Road

Cardiff

CF10 3AL

 

Alternatively, please email your comments to cardiff@bartonwillmore.co.uk.

 

Please provide comments by 4th September 2019.

 

The application is programmed to be submitted in October 2019. Once submitted, you will be able to monitor its progress and make further comments via the Council’s webpage at https://www.pembrokeshire.gov.uk/.

Thank you for visiting www.atebgroup.co.uk

 

Find a Home

Look now

Pay Your Rent

Make payment

Report a Repair

Report today

Request an Appointment

Book now

Talking to us is easy.

For any enquiries or issues, email us at hello@atebgroup.co.uk →

Pop in and talk to us face-to-face, find
us at SA61 1QP →

Call and speak to one
of our lovely team
on 01437 763688 →